
2 (51mm) IPS Duct Round Afterset
436-2-7/8
Wiremold
Bazaarvoice SAP Hybris Integration Version 2.8.1
Installed either before or after concrete pour to create activation from duct. NOTE: Drill a 2 1/2'' (64mm) hole in concrete and a 2 1/4'' (57mm) hole in duct.
- Send
- Save as PDF
-
Added to Favorites Go to favoritesRemove from favorites?Something went wrong. Please try again later.